Drawing Risk Intelligence
Jobotics reads every MEP sheet, flags coordination, schedule and budget risk right on the drawing, and connects each flag to the specs, RFIs, change events, cost codes and schedule it touches.
AI Summary
Reflected ceiling plan for B1 storage and special-ed rooms. Coordination risk where F1 fixtures meet the gyp/ACT transition and where supply duct crosses the fixture layout; F5 fixtures are long-lead with no submittal logged.
Risk flags · 3
F1 fixture falls on gyp / ACT ceiling transition
F5 wrap-around: 8–10 wk lead, submittal not received
24x12 supply duct at 9'-0" crosses F1 layout
AI Tags
Click a flag or a marker · Sample project, illustrative data
Drawing Analysis
Drop in a drawing set, shop drawings or ASKs. Jobotics reads each sheet the way your project engineer would, and it doesn't get tired on sheet 400.
Each sheet is classified by discipline and by what's on it: fixtures, equipment, ceiling types, rooms.
A short summary of what each sheet shows and why it matters to your scope.
Fixture and equipment tags connect to their schedules and spec sections automatically.
Sheet index · 12 files
10 analyzedRisk Flags
Each sheet is checked for coordination, schedule, quality, inspection, budget and contract risk. You get a prioritized list with action items, not a pile of markups.
Every flag points to the area of the sheet it came from, so the team can verify it in seconds.
High and medium flags are sorted by category, so the urgent items surface first.
Each flag comes with the next step: coordinate, verify lead time, write the RFI.
Project risk report · by category
Sample projectRevision Impact
When a bulletin or ASK lands, the question isn't only what moved on the sheet. It's what that change does to your budget, your buyout and your schedule.
Added, removed and relocated elements, summarized in plain English.
See which budget lines and open purchase orders each change touches.
Your subcontract's notice window is pulled in automatically, so you don't waive a claim.
ASK-011 · Rev 1 → Rev 2
3 changesRev 1
Rev 2
Context Graph
Document tools stop at the sheet. The Jobotics context graph keeps going, from the drawing to the spec, submittal, RFI, change event, cost code, schedule activity and the clause in your subcontract. Click any node.
Connected to your ERP, schedule and field data, not just PDFs, so a flag comes with its cost and schedule impact.
RFI answers, approvals and change decisions stay attached to the element they changed.
Every project adds to the graph, so the next bid starts with what the last job taught you.
Ask the Graph
Ask the way you'd ask your best project engineer. In construction, almost right isn't good enough, so every answer shows its sources.
No filters, no reports. Ask about a floor, a system, a sub or a cost code.
Each claim links to the drawing area, spec section, RFI or cost line it came from.
Answers combine drawing risk with budget, commitments and schedule from your systems.
Risk → Action
Finding the risk is half the job. Jobotics drafts the paperwork and routes it the way your team already works.
Categorized, rated and linked to the graph.
With the drawing, spec and contract references filled in.
Pushed into Fieldwire, Procore or Autodesk Build.
Built into the field
Jobotics partners with Fieldwire by Hilti to bring drawing and document risk analysis directly into Fieldwire workflows, where your foremen and PMs already are.
Read the announcement →
Pick a current job. We'll run its drawings through Jobotics and walk you through what we find, flag by flag, connected to your cost and schedule.